Ayuda
Ir al contenido

Dialnet


Resumen de CROSS Safety Report: Accidental partial demolition of a beam

Collaborative Reporting for Safer Structures

  • This month we present a report about a permanent works design engineer who noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.


Fundación Dialnet

Dialnet Plus

  • Más información sobre Dialnet Plus