This month we present a report about a permanent works design engineer who noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
© 2001-2026 Fundación Dialnet · Todos los derechos reservados