Periodo de publicación recogido
|
|
|
Two-stage flow-shop scheduling problem with non-identical second stage assembly machines.
J. Navaei, S.M.T. Fatemi Ghomi, F. Jolai
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 69, Nº. 9-12, 2013, págs. 2215-2226
A cross-docking scheduling problem with sub-population multi-objective algorithms.
A. Boloori Arabani, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 58, Nº. 5-8, 2012, págs. 741-762
M.R. Khadivi, S.M.T. Fatemi Ghomi
Waste management, ISSN-e 0956-053X, Nº. 6, 2012, págs. 1258-1265
Scheduling open shops with parallel machines to minimize total completion time
B. Naderi, S.M.T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh
Journal of computational and applied mathematics, ISSN 0377-0427, Vol. 235, Nº 5, 2011, págs. 1275-1287
Due windows group scheduling using an effective hybrid optimization approach.
J. Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 46, Nº. 5-8, 2010, págs. 721-736
A multi-criteria cross-docking scheduling with just-in-time approach.
A.R. Boloori Arabani, S.M.T. Fatemi Ghomi, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 49, Nº. 5-8, 2010, págs. 741-756
M. Mohammadi, S.A. Torabi, S.M.T. Fatemi Ghomi, B. Karimi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 49, Nº. 1-4, 2010, págs. 201-212
An efficient architecture for scheduling flexible job-shop with machine availability constraints.
E. Moradi, S.M.T. Fatemi Ghomi, M. Zandieh
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 51, Nº. 1-4, 2010, págs. 325-340
Application of chance-constrained programming for stochastic group shop scheduling problem.
F. Ahmadizar, M. Ghazanfari, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 42, Nº. 3-4, 2009, págs. 321-334
Scheduling sequence-dependent setup time job shops with preventive maintenance.
B. Naderi, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 43, Nº. 1-2, 2009, págs. 170-181
J. Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 44, Nº. 7-8, 2009, págs. 795-808
New dispatching rules to minimize rejection and tardiness costs in a dynamic flexible flow shop.
K. Kianfar, S.M.T. Fatemi Ghomi, B. Karimi
International journal of advanced manufacturing technology, ISSN 0268-3768, Vol. 45, Nº. 7-8, 2009, págs. 759-771
Esta página recoge referencias bibliográficas de materiales disponibles en los fondos de las Bibliotecas que participan en Dialnet. En ningún caso se trata de una página que recoja la producción bibliográfica de un autor de manera exhaustiva. Nos gustaría que los datos aparecieran de la manera más correcta posible, de manera que si detecta algún error en la información que facilitamos, puede hacernos llegar su Sugerencia / Errata.
© 2001-2024 Fundación Dialnet · Todos los derechos reservados