Joaquín Bautista Valhondo, Alberto Cano Merino, Rocío Alfaro Ramos
In this study we present a formulation for the MMSP-W (Mixed Model Sequencing Problem with Work overload Minimization) for productions lines with both serial workstations and rules for interrupting operations. We propose a combination of the models M5 and M6 proposed by Bautista and Cano (Eur J OperRes 210:495–513, 2011) and analyze the results obtained, using the BDP (Bounded Dynamic Programming), through a case study of the powertrain line of the Nissan plant in Barcelona.
© 2001-2024 Fundación Dialnet · Todos los derechos reservados