Análisis de métodos de programación de obra: Caso: Biblioteca de la Universidad del Azuay

    1. [1] Universidad Católica de Cuenca

      Universidad Católica de Cuenca

      Cuenca, Ecuador

  • Localización: Polo del Conocimiento: Revista científico - profesional, ISSN-e 2550-682X, Vol. 7, Nº. 8 (AGOSTO 2022), 2022, págs. 2828-2912
  • Idioma: español
  • Títulos paralelos:
    • Análise de métodos de agendamento de trabalho: Caso: Biblioteca da Universidade de Azuay
    • Analysis of work scheduling methods: Case: Library of the University of Azuay
  • Enlaces
  • Resumen
    • español

      Esta investigación, presenta un análisis y propuesta para los métodos de programación de obra aplicado en la Biblioteca de la Universidad del Azuay. Se aplica un método exploratorio y relacional con enfoque cuantitativo, ya que se estudia un proceso que no está claramente definido a partir del análisis numérico de un caso en concreto y relacionarlos con variables asociadas que conlleven a una posible solución y comprensión del caso en estudio. Se inicia con una exploración bibliográfica en la cual, se revisan las principales concepciones y aportes teóricos relacionados con los métodos de programación de obra, especialmente con el método PERT, CPM, GANTT y LDB. Asimismo, se analizan los datos registrados en la Biblioteca del Azuay para evidenciar cual fue el proceso organizativo y de planificación ejecutado. Con la información recopilada, se procede a ingresar los datos en el programa MS Project para determinar cual de los métodos de programación es el más efectivo para disminuir los tiempos de entrega. La hipótesis planteada, es que la implementación de los métodos de planificación de obra es capaz de reducir los tiempos de ejecución y mejorar la organización de los procedimientos constructivos. Se pudo evidenciar que todos los métodos de programación de obra disminuyeron el porcentaje de días de ejecución, sin embargo, el más eficiente fue el método LDB.

    • English

      This research presents an analysis and proposal for the work programming methods applied in the Library of the University of Azuay. An exploratory and relational method with a quantitative approach is applied, since a process that is not clearly defined is studied from the numerical analysis of a specific case and relate them to associated variables that lead to a possible solution and understanding of the case under study. It begins with a bibliographical exploration in which the main conceptions and theoretical contributions related to work scheduling methods are reviewed, especially with the PERT, CPM, GANTT and LDB methods. Likewise, the data recorded in the Azuay Library is analyzed to show what was the organizational and planning process executed. With the information collected, the data is entered into the MS Project program to determine which of the programming methods is the most effective to reduce delivery times.

      The proposed hypothesis is that the implementation of construction planning methods is capable of reducing execution times and improving the organization of construction procedures. It was possible to show that all the work scheduling methods decreased the percentage of days of execution, however, the most efficient was the LDB method.

    • português

      Esta pesquisa apresenta uma análise e proposta para os métodos de programação de trabalho aplicados na Biblioteca da Universidade de Azuay. Aplica-se um método exploratório e relacional com abordagem quantitativa, uma vez que um processo não claramente definido é estudado a partir da análise numérica de um caso específico e relacioná-los com variáveis associadas que levam a uma possível solução e compreensão do caso em estudo. Inicia-se com uma exploração bibliográfica em que são revisadas as principais concepções e contribuições teóricas relacionadas aos métodos de escalonamento do trabalho, especialmente com os métodos PERT, CPM, GANTT e LDB. Da mesma forma, os dados registrados na Biblioteca Azuay são analisados para mostrar qual foi o processo organizacional e de planejamento executado. Com as informações coletadas, os dados são inseridos no programa MS Project para determinar qual dos métodos de programação é o mais eficaz para reduzir os prazos de entrega. A hipótese proposta é que a implementação de métodos de planejamento de obras é capaz de reduzir os tempos de execução e melhorar a organização dos procedimentos construtivos. Foi possível mostrar que todos os métodos de escalonamento de obra diminuíram o percentual de dias de execução, porém, o mais eficiente foi o método LDB.