The works carried out as the result of an operation designed to improve the pipes and rainwater drainage system, and to reduce external humidity in the apse of the building, were monitored from an archaeological perspective. Nothing of archaeological interest was found.
© 2001-2026 Fundación Dialnet · Todos los derechos reservados