Comparing Mixed & Integer Programming vs. Constraint Programming by solving Job-Shop Scheduling Problems

  • Autores: Renata Melo e Silva de Oliveira, Maria S. F. O. de C. Ribeiro
  • Localización: Independent Journal of Management & Production, ISSN-e 2236-269X, Vol. 6, Nº. 1, 2015, págs. 211-238
  • Idioma: inglés
  • Enlaces
  • Resumen
    • Scheduling is a key factor for operations management as well as for business success. From industrial Job-shop Scheduling problems (JSSP), many optimization challenges have emerged since de 1960s when improvements have been continuously required such as bottlenecks allocation, lead-time reductions and reducing response time to requests.  With this in perspective, this work aims to discuss 3 different optimization models for minimizing Makespan. Those 3 models were applied on 17 classical problems of examples JSSP and produced different outputs.  The first model resorts on Mixed and Integer Programming (MIP) and it resulted on optimizing 60% of the studied problems. The other models were based on Constraint Programming (CP) and approached the problem in two different ways: a) model CP1 is a standard IBM algorithm whereof restrictions have an interval structure that fail to solve 53% of the proposed instances, b) Model CP-2 approaches the problem with disjunctive constraints and optimized 88% of the instances. In this work, each model is individually analyzed and then compared considering: i) Optimization success performance, ii) Computational processing time, iii) Greatest Resource Utilization and, iv) Minimum Work-in-process Inventory. Results demonstrated that CP-2 presented best results on criteria i and ii, but MIP was superior on criteria iii and iv and those findings are discussed at the final section of this work.


Fundación Dialnet

Dialnet Plus

  • Más información sobre Dialnet Plus

Opciones de compartir

Opciones de entorno