Ayuda
Ir al contenido

Resource scheduling of workflow multi-instance migration based on the shuffled leapfrog algorithm

  • Mingshun, Yang [1] ; Xinqin, Gao [1] ; Yuan, Cao [1] ; Yong, Liu [1] ; Yan, Li [1]
    1. [1] University of Technology

      University of Technology

      Rusia

  • Localización: Journal of Industrial Engineering and Management, ISSN-e 2013-0953, Vol. 8, Nº. 1, 2015, págs. 217-232
  • Idioma: inglés
  • Enlaces
  • Resumen
    • Purpose: When the workflow changed, resource scheduling optimization in the process of the current running instance migration has become a hot issue in current workflow flexible research; purpose of the article is to investigate the resource scheduling problem of workflow multi-instance migration. Design/methodology/approach: The time and cost relationships between activities and resources in workflow instance migration process are analyzed and a resource scheduling optimization model in the process of workflow instance migration is set up; Research is performed on resource scheduling optimization in workflow multi-instance migration, leapfrog algorithm is adopted to obtain the optimal resource scheduling scheme. An example is given to verify the validity of the model and the algorithm. Findings: under the constraints of resource cost and quantity, an optimal resource scheduling scheme for workflow migration is found, ensuring a minimal running time and optimal cost.


Fundación Dialnet

Dialnet Plus

  • Más información sobre Dialnet Plus

Opciones de compartir

Opciones de entorno