Ayuda
Ir al contenido

Dialnet


A hybrid flow shop model for an ice cream production scheduling problem

    1. [1] Universitat Politècnica de Catalunya

      Universitat Politècnica de Catalunya

      Barcelona, España

  • Localización: Journal of Industrial Engineering and Management, ISSN-e 2013-0953, Vol. 2, Nº. 1, 2009, págs. 60-89
  • Idioma: inglés
  • Enlaces
  • Resumen
    • In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the real constraints and the criteria used by planners. The problem considered has been formulated as a mixed integer programming. Further, two competitive heuristic procedures have been developed and one of them will be proposed to schedule in the ice cream factory.


Fundación Dialnet

Dialnet Plus

  • Más información sobre Dialnet Plus

Opciones de compartir

Opciones de entorno