Our intervention consisted of a systematic prospecting followed by the digging of a total of nineteen ditches in the area in which the Lantarón combined cycle power station is due to be built, as well as at the location of the high voltage cable line pylons which will link the power station to the substation located in Puentelarrá. No results of interest were found.