During this season, the excavation surface has been extended. The work carried out had a twofold purpose:
on the one hand it aimed to complete the excavation of structure 6, and on the other, to finish defining the limits of structure 7, located in sector III of the site.
© 2001-2026 Fundación Dialnet · Todos los derechos reservados