S. Thiagarajan, Chandrasekharan Rajendran
págs. 463-503
B. Bidokhti, S.M.R. Sakkaki, A. Azadeh
págs. 504-519
Minimizing makespan in a two-stage system with flowshop and open shop
Fuh-Der Chou, Ling-Huey Su, Wei-Ching Ting
págs. 520-536
págs. 537-555
Optimization of a multi-response problem in Taguchi's dynamic system
Lee-Ing Tong, Hung-Pin Chiu, Hsin-Ya Yeh, Kun-Lin Hsieh
págs. 556-571
A distributed time-driven simulation method for enabling real-time manufacturing shop floor control
Sohyung Cho
págs. 572-590
Roberto da Costa Quinino, Linda Lee Ho, Anderson L.G. Trindade
págs. 591-599
A stochastic model for the analysis of a two-machine flexible manufacturing cell
Mehmet Savsar, Majid M. Aldaihani
págs. 600-610
A comparison of solution procedures for two-machine flow shop scheduling with late work criterion
Erwin Pesch, Jacek Blazewicz, Malgorzata Sterna, Frank Werner
págs. 611-624
Selecting the best statistical distribution¿a comment and a suggestion on multi-criterion evaluation
págs. 625-628




© 2001-2026 Fundación Dialnet · Todos los derechos reservados